Originally Posted by Huggles
Old Delay/(1+haste%) = New Delay
For slow effects, use the slow % but as a negative.
Just repeat for multiple effects.
DO NOT multiply by 1+slow% to get your new delay. 1*1.4 is not the same as 1/0.6 and your answer will be wrong.
|